PPM software built around fire safety compliance
Planned maintenance in FLOS starts from the contract and ends in evidence. Compliance status for each site is worked out from what was recorded at inspection, not from a field someone typed into.
How FLOS handles planned maintenance
Visits come from the contract
PPM schedules are set from the contract, site and asset, so the frequency each system needs is part of the record from the start.
Status from records
Whether a site is in date, due or overdue is worked out from the recorded inspections against that schedule.
Evidence tied to the inspection
Results, photos and signatures are captured against the inspection they belong to, using templates written against the relevant British Standard.
Defects raised by the inspection
A failed check raises a defect against the clause that failed. From there it is tracked to a remedial quote, client approval and completed work.
The UK standards it is built around
Inspection templates in FLOS are written against the standards UK fire safety contractors work to.
- BS 5839Fire detection and fire alarm systems
- BS 5266Emergency lighting
- BS 5306Fire extinguishing installations
- PAS 79-1Fire risk assessment
- BS 9792Fire risk assessment. Housing. Code of practice
What the record shows
- Which visits are due, done and overdue, per site and asset.
- The inspection evidence behind each result.
- Every open defect raised by an inspection and where it has got to.
- Certificates built from that evidence, blocked while an emergency or critical defect is open.
Ready to see FLOS in action?
30-minute demo. No pressure. Built for people who know the industry.
Book a demo